The college is used to produce engineers required to complete the River Bridge project.
Training[]
Product | Building Level |
Time | Experience | Costs |
Driver | 1 | 6 h | +10 | 5,000 |
Worker | 2 | 8 h | +25 | 25,000 |
Engineer | 3 | 10 h | +40 | 60,000 |
Lab Assistant | 4 | 20 h | +60 | 70,000 |